Field Road Reservoir

South East Kelowna Irrigation District awarded the Field Road Reservoir, disinfection facility and pipelines to Mould Engineering. Mould Engineering prepared a long-term plan that outlined the need for a reservoir and sodium hypochlorite disinfection station which increased chlorine contact time to the users and provided additional fire storage. The reservoir, disinfection equipment, and pipeline sizes were calculated and cost estimates, design drawings were prepared to obtain rezoning and construction approvals. Mould Engineering completed the disinfection facility structure and all the mechanical piping components of the project.

A 2.5 million litre reservoir and disinfection / valve control station was constructed and 1.7 kilometres of pipeline installed. The construction cost for the project, not including the reservoir, was approximately $700,000.