Haddo Spillway

The North Okanagan Water Authority awarded the Haddo Spillway project to Mould Engineering. The project entailed analyzing and investigating the existing spillway for its capacity, calculating watershed runoff, and determining spillway size required to meet the U.S. Bureau of Reclaimation Standards. Mould Engineering was responsible for completing a preliminary study, a detailed site survey, and preparation of design drawings to submit for approvals. Mould Engineering also prepared contract documents, organized and inspected the construction of the new concrete spillway structure and completed an as-constructed report. The project cost approximately $200,000.